| Journals |
| Click on plus symbols ( ) |
| Scopus Indexed Journals |
|
IRJ8. |
Mishra B, Shanmugapriya T, Hsieh S.-H, Chang Y.-T, and Pal A (2025). “BIM-based approach for analyzing carbon emissions of residential buildings in India .“ Innovative Infrastructure Solutions, 10 |
|
IRJ7. |
Houng S.C, Pal A, and Lin J.J (2024). “4D BIM and Reality Model-Driven Camera Placement Optimization for Construction Monitoring .“ Journal of Construction Engineering and Management, 150 |
|
IRJ6. |
Pal A, Lin J.J, Hsieh S.-H, and Golparvar-Fard M (2024). “Activity-level construction progress monitoring through semantic segmentation of 3D-informed orthographic images .“ Automation in Construction, 157 |
|
IRJ5. |
Pal A, Lin J.J, Hsieh S.-H, and Golparvar-Fard M (2023). “Automated vision-based construction progress monitoring in built environment through digital twin.“ Developments in the Built Environment, 16 |
|
IRJ4. |
Wang T.H, Pal A, Lin J.J, and Hsieh S.-H (2023). “Construction Photo Localization in 3D Reality Models for Vision-Based Automated Daily Project Monitoring .“ Journal of Computing in Civil Engineering, 37 |
|
IRJ3. |
Pal A, and Hsieh S.-H (2021). “Deep-learning-based visual data analytics for smart construction management .“ Automation in Construction, 131 |
|
IRJ2. |
Pakhale P.D, and Pal A (2020). “Digital project management in infrastructure project: a case study of Nagpur Metro Rail Project.“ Asian Journal of Civil Engineering, 21 |
|
IRJ1. |
Pal A (2018). “Developing Low-Clinker Ternary Blends for Indian Cement Industry.“ Journal of The Institution of Engineers (India): Series A, 99 |
| Conferences |
| Click on plus symbols ( ) |
| Scopus Indexed Conferences |
|
IC12. |
Rathnayake A, Murguia D, Asmone A.S, Pal A, and Middleton C (2025). “What are the main causes of discontinuous work? .“ Annual Conference of the International Group for Lean Construction, IGLC |
|
IC11. |
Asmone A.S, Pal A, Murguia D, Rathnayake A, and Middleton C (2024). “Where is the evidence of performance improvement in the lean construction literature? .“ Annual Conference of the International Group for Lean Construction, IGLC |
|
IC10. |
Lin P.-H, Pal A, Lin J.J, and Hsieh S.-H (2024). “Individual Component Detection of a Scaffolding Assembly for Vision-Based Safety Check.“ Construction Research Congress 2024, CRC 2024 |
|
IC9. |
Pal A, Lin J.J, and Hsieh S.-H (2024). “Schedule-Driven Analytics of 3D Point Clouds for Automated Construction Progress Monitoring .“ Computing in Civil Engineering 2023: Data, Sensing, and Analytics - Selected Papers from the ASCE International Conference on Computing in Civil Engineering 2023 |
|
IC8. |
Singh A.K, Pal A, Kumar P, Lin J.J, and Hsieh S.-H (2023). “Prospects of Integrating BIM and NLP for Automatic Construction Schedule Management .“ Proceedings of the International Symposium on Automation and Robotics in Construction |
|
IC7. |
Kumar P, Pal A, and Hsieh S.-H (2023). “A Review of Smart City Maturity Assessment Models.“ Lecture Notes in Civil Engineering |
|
IC6. |
Pal A, Lin J.J, and Hsieh S.-H (2022). “Automated Construction Progress Monitoring of Partially Completed Building Elements Leveraging Geometry Modeling and Appearance Detection with Deep Learning.“ Construction Research Congress 2022: Computer Applications, Automation, and Data Analytics - Selected Papers from Construction Research Congress 2022 |
|
IC5. |
Pal A, Lin J.J, and Hsieh S.-H (2021). “A Framework for Automated Daily Construction Progress Monitoring Leveraging Unordered Site Photographs.“ Computing in Civil Engineering 2021 - Selected Papers from the ASCE International Conference on Computing in Civil Engineering 2021 |
|
IC4. |
Chang Y.T, Pal A, Hackl J, and Hsieh S.H (2021). “The Needs and Trends of Urban Simulation Platforms- A Review.“ Proceedings of the International Symposium on Automation and Robotics in Construction |
|
IC3. |
Pham V.-H, Chen P.-H, Pal A, Christian, and Hsieh S.-H (2021). “Automatic extraction of daily concrete requirements from 3D BIM and project schedules .“ AIP Conference Proceedings |
|
IC2. |
Pal A, and Nassarudin A (2021). “Integrated project delivery adoption framework for construction projects in India .“ IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020 |
|
IC1. |
Singhal R, Maheswari J.U, Charlesraj V.P.C, and Pal A (2018). “MDM-based buffer estimation in construction projects .“ IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers |
