Journals |
Click on plus symbols ( ) |
Scopus Indexed Journals |
ScJ32. |
Jacob J., and Varghese K. (2018). “A framework for ad hoc information management for the building design process.“ Engineering, Construction and Architectural Management, ,25(8), 1034-1052 |
ScJ31. |
Soman R.K., Raphael B., and Varghese K. (2017). “A System Identification Methodology to monitor construction activities using structural responses.“ Automation in Construction, ,75, 79-90 |
ScJ30. |
Loganathan S., Srinath P., Kumaraswamy M., Kalidindi S., and Varghese K. (2017). “Identifying and addressing critical issues in the Indian construction industry: Perspectives of large building construction clients.“ Journal of Construction in Developing Countries, ,22, 121-144 |
ScJ29. |
Kolagani N., Ramu P., and Varghese K. (2015). “Participatory Model Calibration for Improving Resource Management Systems: Case Study of Rainwater Harvesting in an Indian Village.“ Journal of the American Water Resources Association, ,51(6), 1708-1721 |
ScJ28. |
Joshua L., and Varghese K. (2014). “Automated recognition of construction labour activity using accelerometers in field situations.“ International Journal of Productivity and Performance Management, ,63(7), 841-862 |
ScJ27. |
Ummer N., Maheswari U., Matsagar V.A., and Varghese K. (2014). “Factors influencing design iteration with a focus on project duration.“ Journal of Management in Engineering, ,30(1), 127-130 |
ScJ26. |
Senthilkumar V., and Varghese K. (2013). “Case study-based testing of design interface management system.“ Journal of Management in Engineering, ,29(3), 279-288 |
ScJ25. |
Sivaprakasam M., Gettu R., Varghese K., and Vijaykumar T. (2013). “Study of possible productivity improvement in the fabrication of tunnel lining segments for a hydropower project.“ Indian Concrete Journal, ,87(6), 27-38 |
ScJ24. |
Joshua L., and Varghese K. (2013). “Selection of accelerometer location on bricklayers using decision trees.“ Computer-Aided Civil and Infrastructure Engineering, ,28(5), 372-388 |
ScJ23. |
Das S., Mirnalinee T.T., and Varghese K. (2011). “Use of salient features for the design of a multistage framework to extract roads from high-resolution multispectral satellite images.“ IEEE Transactions on Geoscience and Remote Sensing, ,49, 5766732, 3906-3931 |
ScJ22. |
Joshua L., and Varghese K. (2011). “Accelerometer-based activity recognition in construction.“ Journal of Computing in Civil Engineering, ,25(5), 370-379 |
ScJ21. |
Arai T., Bock T., and Varghese K. (2011). “Introduction.“ Computer-Aided Civil and Infrastructure Engineering, ,26(5), 335-335 |
ScJ20. |
Mirnalinee T.T., Das S., and Varghese K. (2011). “An Integrated Multistage Framework for Automatic Road Extraction from High Resolution Satellite Imagery.“ Journal of the Indian Society of Remote Sensing, ,39(1), 1-25 |
ScJ19. |
Anilkumar P.P., Varghese K., and Ganesh L.S. (2010). “Formulating a coastal zone health metric for landuse impact management in urban coastal zones.“ Journal of Environmental Management, ,91(11), 2172-2185 |
ScJ18. |
Senthilkumar V., Varghese K., and Chandran A. (2010). “A web-based system for design interface management of construction projects.“ Automation in Construction, ,19(2), 197-212 |
ScJ17. |
Senthilkumar V., and Varghese K. (2009). “Structured methodology to formulate drawing dependency structure matrix for construction design.“ Architectural Engineering and Design Management, ,5(4), 225-248 |
ScJ16. |
Varghese K., Ganesh L.S., Mani M., Anilkumar P.P., Murthy R., and Subramaniam B.R. (2008). “Identifying critical variables for coastal profiling in ICZM planning-A systems approach.“ Ocean and Coastal Management, ,51(1), 73-94 |
ScJ15. |
Mani M., Varghese K., and Ganesh L.S. (2007). “A systemic sustainability evaluation based on water and sanitary conditions in Velachery settlement in South India.“ International Journal of Sustainable Development and Planning, ,2(4), 408-434 |
ScJ14. |
Mani M., Varghese K., and Ganesh L.S. (2007). “Sustainability evaluation of an urban residential settlement.“ Environmental Engineering and Management Journal, ,6(3), 189-203 |
ScJ13. |
Maheswari J.U., Varghese K., and Sridharan T. (2006). “Application of dependency structure matrix for activity sequencing in concurrent engineering projects.“ Journal of Construction Engineering and Management, ,132(5), 482-490 |
ScJ12. |
Mani M., Varghese K., and Ganesh L.S. (2005). “Integrated model framework to simulate sustainability of human settlements.“ Journal of Urban Planning and Development, ,131(3), 147-158 |
ScJ11. |
Maheswari J.U., and Varghese K. (2005). “Project Scheduling using Dependency Structure Matrix.“ International Journal of Project Management, ,23(3), 223-230 |
ScJ10. |
Deen Ali M.S.A., Babu N.R., and Varghese K. (2005). “Collision free path planning of cooperative crane manipulators using genetic algorithm.“ Journal of Computing in Civil Engineering, ,19(2),182-193 |
ScJ9. |
Sivakumar P.L., Varghese K., and Ramesh Babu N. (2003). “Automated path planning of cooperative crane lifts using heuristic search.“ Journal of Computing in Civil Engineering, ,17(3), 197-207 |
ScJ8. |
Bidaiah H.I., Varghese K., and Mazumdar A.N. (2003). “Computer aided planning for tunnel construction.“ Journal of the Institution of Engineers (India): Civil Engineering Division, ,84(1), 18-26 |
ScJ7. |
Reddy H.R., and Varghese K. (2002). “Automated path planning for mobile crane lifts.“ Computer-Aided Civil and Infrastructure Engineering, ,17(6), 439-448 |
ScJ6. |
Shanmugam S.P., Parvatham R., and Varghese K. (2002). “Geographic information system for coordination of fast-track projects.“ Computer-Aided Civil and Infrastructure Engineering, ,17(4), 294-306 |
ScJ5. |
Ramesh K.V.S.S.N.S., Varghese K., and Sridharan T. (2001). “Planning construction operations using discrete event simulation.“ Journal of the Institution of Engineers (India): Civil Engineering Division, ,82, 150-156 |
ScJ4. |
Varghese K., Dharwadkar P., Wolfhope J., and O\'Connor J.T. (1997). “A heavy lift planning system for crane lifts.“ Computer-Aided Civil and Infrastructure Engineering, ,12(1), 31-42 |
ScJ3. |
Varghese K., Dharwadkar P., Wolfhope J., and O\'Connor J.T. (1997). “A heavy lift planning system for crane lifts.“ Microcomputers in Civil Engineering, ,12(1), 31-42 |
ScJ2. |
Varghese K., and O\'Connor J.T. (1995). “Routing large vehicles on industrial construction sites.“ Journal of Construction Engineering and Management, ,121(1), 1-12 |
ScJ1. |
Persad K.R., O’Connor J.T., and Varghese K. (1995). “Forecastng engineering manpower requirements for highway preconstruction activities.“ Journal of Management in Engineering, ,11(3), 41-47 |
Conferences |
Click on plus symbols ( ) |
Scopus lndexed Conferences |
SiC54. |
Sahadevan V., and Varghese K. (2019). “AHP and CBA application to layout design: A case of classroom layout assessment.“ 27th Annual Conference of the International Group for Lean Construction, IGLC 2019 |
SiC53. |
Reja V.K., and Varghese K. (2019). “Impact of 5G technology on IoT applications in construction project management.“ Proceedings of the 36th International Symposium on Automation and Robotics in Construction, ISARC 2019 |
SiC52. |
Simon S.M., and Varghese K. (2018). “Assessment of organizational culture in construction – A case study approach.“ IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers |
SiC51. |
Sahadevan V., and Varghese K. (2018). “Stakeholder value evolution, capture and assessment in AEC project design.“ IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers |
SiC50. |
Pushkar A., Senthilvel M., and Varghese K. (2018). “Automated progress monitoring of masonry activity using photogrammetric point cloud.“ ISARC 2018 - 35th International Symposium on Automation and Robotics in Construction and International AEC/FM Hackathon: The Future of Building Things |
SiC49. |
Harichandran A., Raphael B., and Varghese K. (2018). “Inferring construction activities from structural responses using support vector machines.“ ISARC 2018 - 35th International Symposium on Automation and Robotics in Construction and International AEC/FM Hackathon: The Future of Building Things |
SiC48. |
Sainath Y., Varghese K., and Raghavan N. (2018). “Framework for progressive evaluation of lean construction maturity using multi-dimensional matrix.“ IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers |
SiC47. |
Sivapriya V., Senthilvel M., and Varghese K. (2018). “Automatic reassembly of fragments for restoration of heritage site structures.“ ISARC 2018 - 35th International Symposium on Automation and Robotics in Construction and International AEC/FM Hackathon: The Future of Building Things |
SiC46. |
Raghavan N., Varghese K., Mahalingam A., and Delhi V.S.K. (2018). “Simulation exercise for collaborative planning system / Last planner SystemTM (colplasse).“ IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers |
SiC45. |
Senthilvel M., Soman R.K., and Varghese K. (2017). “Comparison of handheld devices for 3D reconstruction in construction.“ ISARC 2017 - Proceedings of the 34th International Symposium on Automation and Robotics in Construction |
SiC44. |
Delhi V.S.K., Raghavan N., Mahalingam A., and Varghese K. (2017). “Initial euphoria to sustained change - Mainstreaming lean culture.“ IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction |
SiC43. |
Lalitha K.S., Das S., Menon A., and Varghese K. (2017). “Graph-based clustering for apictorial jigsaw puzzles of hand shredded content-less pages.“ Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) |
SiC42. |
Kodeboyina S.M., and Varghese K. (2016). “Low cost augmented reality framework for construction applications.“ ISARC 2016 - 33rd International Symposium on Automation and Robotics in Construction |
SiC41. |
Sivaraman A., and Varghese K. (2016). “Pull Planning System to Coordinate the Engineering Procurement and Construction on Process Plant Projects.“ Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016 |
SiC40. |
Raphael B., Rao K.S.C., and Varghese K. (2016). “Automation of modular assembly of structural frames for buildings.“ ISARC 2016 - 33rd International Symposium on Automation and Robotics in Construction |
SiC39. |
Senthilvel M., Varghese K., and Ramesh Babu N. (2016). “Building Information Modeling for Precast Construction: A Review of Research and Practice.“ Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016 |
SiC38. |
Lalitha K.S., Das S., Menon A., and Varghese K. (2016). “Simultaneous reconstruction of multiple hand shredded content-less pages using graph-based global reassembly.“ Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) |
SiC37. |
Raghavan N., Delhi V.S.K., Mahalingam A., and Varghese K. (2016). “Introducing lean construction philosophy in E-P-C phases of a large industrial project.“ IGLC 2016 - 24th Annual Conference of the International Group for Lean Construction |
SiC36. |
Varghese K. (2015). “Automation for rapid construction of metro rail projects.“ 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings |
SiC35. |
Soman R.K., Raphael B., and Varghese K. (2015). “Sensor placement to monitor launching girder operations in segmental construction.“ 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings |
SiC34. |
Doloi H., Varghese K., and Raphael B. (2015). “Drivers and impediments of building information modelling from a social network perspective.“ 32nd International Symposium on Automation and Robotics in Construction and Mining: Connected to the Future, Proceedings |
SiC33. |
Arumugam T.R., and Varghese K. (2014). “Characterization of flow in multi storied residential building construction.“ 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014 |
SiC32. |
Mathews V., Varghese K., and Mahalingam A. (2014). “A study on significance of system dynamics approach in understanding adoption of information technology in building construction projects.“ 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014 - Proceedings |
SiC31. |
Raghavan N., Kalidindi S., Mahalingam A., Varghese K., and Ayesha A. (2014). “Implementing lean concepts on indian construction sites: Organisational aspects and lessons learned.“ 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014 |
SiC30. |
Kolagani N., Ramu P., Van Elzakker C., Naniwadekar V., and Varghese K. (2014). “Requirement analysis and metric development for public participatory GIS.“ Proceedings - 7th International Congress on Environmental Modelling and Software: Bold Visions for Environmental Modeling, iEMSs 2014 |
SiC29. |
Shankar A., and Varghese K. (2013). “Evaluation of location based management system in the construction of power transmission and distribution projects.“ ISARC 2013 - 30th International Symposium on Automation and Robotics in Construction and Mining, Held in Conjunction with the 23rd World Mining Congress |
SiC28. |
Jacob J., and Varghese K. (2012). “A model for product-process integration in building industry using Industry Foundation Classes and Design Structure Matrix.“ Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress |
SiC27. |
Joshua L., and Varghese K. (2012). “Classification of bricklaying activities in work sampling categories using accelerometers.“ Construction Research Congress 2012: Construction Challenges in a Flat World, Proceedings of the 2012 Construction Research Congress |
SiC26. |
Oka S., Garg A., and Varghese K. (2012). “Vectorization of contour lines from scanned topographic maps.“ Automation in Construction |
SiC25. |
Raj M., and Varghese K. (2012). “Positioning of human resources in a construction environment using Zigbee.“ 2012 Proceedings of the 29th International Symposium of Automation and Robotics in Construction, ISARC 2012 |
SiC24. |
Jacob J., and Varghese K. (2012). “Analysing process-oriented BIM Execution Plan using MDM.“ Gain Competitive Advantage by Managing Complexity - Proceedings of the 14th International Dependency and Structure Modelling Conference, DSM 2012 |
SiC23. |
Jacob J., and Varghese K. (2011). “Integration of BIM and DSM to improve design process in building construction projects.“ Invest on Visualization - Proceedings of the 13th International DSM Conference |
SiC22. |
Joshua L., and Varghese K. (2011). “Video annotation framework for accelerometer placement in worker activity recognition studies.“ Proceedings of the 28th International Symposium on Automation and Robotics in Construction, ISARC 2011 |
SiC21. |
Mangai U.G., Samanta S., Das S., Chowdhury P.R., Varghese K., and Kalra M. (2010). “A hierarchical multi-classifier framework for landform segmentation using multi-spectral satellite images - A case study over the Indian subcontinent.“ Proceedings - 4th Pacific-Rim Symposium on Image and Video Technology, PSIVT 2010 |
SiC20. |
Joshua L., and Varghese K. (2010). “Construction activity classification using accelerometers.“ Construction Research Congress 2010: Innovation for Reshaping Construction Practice - Proceedings of the 2010 Construction Research Congress |
SiC19. |
Varghese K., and Majumdar M. (2010). “Visualization and communication platform for remote monitoring of infrastructure projects.“ 2010 - 27th International Symposium on Automation and Robotics in Construction, ISARC 2010 |
SiC18. |
Senthilkumar V., and Varghese K. (2009). “Drawing DSM implementation in construction design-discussions on applicability.“ Proceedings of the 11th International DSM Conference |
SiC17. |
Venkatesan R., Varghese K., and Ananthanarayanan K. (2009). “Motivation and demotivation 'cause factors' for engineers in construction organisations.“ Association of Researchers in Construction Management, ARCOM 2009 - Proceedings of the 25th Annual Conference |
SiC16. |
Venkatachalam S., Varghese K., and Shivaji C.Y. (2009). “Achieving lean design using design interface management tool.“ Proceedings of IGLC17: 17th Annual Conference of the International Group for Lean Construction |
SiC15. |
Mirnalinee T.T., Das S., and Varghese K. (2009). “Integration of region and edge-based information for efficient road extraction from high resolution satellite imagery.“ Proceedings of the 7th International Conference on Advances in Pattern Recognition, ICAPR 2009 |
SiC14. |
Surati V.R., Varghese K., and Senthilnathan K. (2009). “Computational models for reduction of quarry waste for breakwater construction projects.“ 2009 26th International Symposium on Automation and Robotics in Construction, ISARC 2009 |
SiC13. |
Senthilkumar V., and Varghese K. (2008). “Design interface management system (DIMS) for construction projects.“ Proceedings of the 10th International DSM Conference |
SiC12. |
Kumar K., Varghese K., Nathan K.S., and Ananthanarayanan K. (2008). “Automated geometry control of precast segmental bridges.“ ISARC 2008 - Proceedings from the 25th International Symposium on Automation and Robotics in Construction |
SiC11. |
Satyanarayana Reddy D., Varghese K., and Srinivasan N. (2007). “A computer-aided system for planning and 3D-visualization of multiple heavy lifts operations.“ Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction |
SiC10. |
Kumar P.P.A., Varghese K., and Ganesh L.S. (2007). “Evolution of Coastal zone health Index (CHI) as a metric to evaluate ICZM implementation efficiency.“ Coastal Management - Proceedings of the two-day International Conference organised by the Institution of Civil Engineers, ICE |
SiC9. |
Maheswari J.U., and Varghese K. (2007). “Modeling design iteration using DSM and simulation.“ Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction |
SiC8. |
Gajamani G.K., and Varghese K. (2007). “Automated project schedule and inventory monitoring using RFID.“ Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction |
SiC7. |
Nonis C.N., Varghese K., and Suresh K.S. (2007). “Investigation of an AHP based multi criteria weighting scheme for GIS routing of cross country pipeline projects.“ Automation and Robotics in Construction - Proceedings of the 24th International Symposium on Automation and Robotics in Construction |
SiC6. |
Vijaya Bhaskar S., Ramesh Babu N., and Varghese K. (2006). “Spline based trajectory planning for cooperative crane lifts.“ 2006 Proceedings of the 23rd International Symposium on Robotics and Automation in Construction, ISARC 2006 |
SiC5. |
Uma Maheswari J., and Varghese K. (2005). “A structured approach to form dependency structure matrix for construction projects.“ 22nd International Symposium on Automation and Robotics in Construction, ISARC 2005 |
SiC4. |
Mahalingam A., Nair H.S., and Varghese K. (2000). “A computer-aided heavy lift planning model.“ Proceedings of the 8th International Conference on Computing in Civil and Building Engineering |
SiC3. |
Mahalingam A., Nair H.S., and Varghese K. (2000). “A computer-aided heavy lift planning model.“ Computing in Civil and Building Engineering |
SiC2. |
Philip Manoj, Mahadevan N., and Varghese Koshy (1997). “Optimization of construction site layout - a genetic algorithm approach.“ Computing in Civil Engineering (New York) |
SiC1. |
Dharwadkar Parmanand V., Varghese Koshy, O\'Connor James T., and Gatton Thomas M. (1994). “Graphical visualization for planning heavy lifts.“ Computing in Civil Engineering (New York) |